JOB NO YEAR PROJECT NAME JOB DESCRIPTIONS CLIENT CONTRACT SUM TENTATIVE COMPLETION STATUS
J22277 2022 TPTL244 Pak Shek Kok, Tai Po Design, Supply & Installation of Glass Wall and Aluminium Cladding to Podium Sanfield (Management) Limited 38,906,883.00 Dec 2023 Design
J22276 2022 TPTL No. 157, Sai Sha, Shap Sze Heung Design, Supply & Installation of Glass Wall, Shopfront, Canopy and Aluminium Works to Sport Centre Sanfield (Management) Limited 84,597,043.00 Jun 2023 Design
J22275 2022 NKIL No. 6607, Shing Kai Road, Kai Tak Design, Supply and Installation of Curtain Wall & Other Facade Works (Office Portion) Hip Hing Construction Company Limited 222,378,183.00 Dec 2023 Design
J22273 2022 YLTL510, Yuen Long Design, Supply & Installation of Re-instatement Works of SYLC’s Facade and Car Ramp Sanfield (Management) Limited 2,930,672.40 Dec 2022 WIP
J22272 2022 STRC OB6 STRC OB6 Design Unlimited Co., Limited 1,841,870.00 Dec 2022 WIP
J22271 2022 NKIL6550 Cheung Sha Wan, Kowloon Design, Supply & Installation of Aluminium Canopy for Pier & Covered Walkway Sanfield (Management) Limited 34,505,611.00 Jun 2023 Design
J22270 2022 Lung Tsun Stone Bridge Preservation Corridor at Kai Tak Design, Supply and Installation Curtain Wall at Lift L-2 Chun Wo Construction and Engineering Company Limite 2,956,920.00 Dec 2023 Design
J21269 2021 Queensway Footbridge Two at Harcourt Garden and Adjoining Areas at Pacific Place, Hong Kong Façade Works NSC for Queensway Footbridge Two at Pacific Place Gammon Construction Company Limited 56,638,050.00 Jan 2024 Design
J21268 2021 Members Stand III 2/F, 7/F and 8/F at Happy Valley Racecourse of the Hong Kong Jockey Club Glass Walls, Glass Balustrades and Cladding Works Design Unlimited Co., Ltd. 10,683,750.00 Aug 2023 WIP
J21267b 2021 Shatin Racecourse for The Hong Kong Jockey Club Façade Works (DC2) at Hub Area for Members Main Entrance (MME) Redevelopment and Multi-Level Carpark (MLCP) The Hong Kong Jockey Club 22,341,680.00 Sep 2022 WIP
J21267a 2021 Shatin Racecourse for The Hong Kong Jockey Club Façade Works (NSC1) at Multi-Level Carpark (MLCP) and Footbridge (FB) for Members Main Entrance (MME) Redevelopment and Multi-Level Carpark (MLCP) Chun Wo Construction and Engineering Company Limited 64,503,780.00 Sep 2022 WIP
J21266 2021 The Kai Tak Sports park at Kai Tak, Kowloon City District, Hong Kong Design, Supply and Installation of Supporting Steel Structure from L05 to L07 for External Façade at Main Stadium Hip Hing Engineering Co., Ltd. 9,800,000.00 Oct 2022 WIP
J20265 2020 No. 625 King’s Road at North Point, Hong Kong Design, Supply and Installation of Façade and Cladding for Proposed Alterations and Additions Works Island Land Development Limited 9,968,940.00 Dec 2021 Completed
J20263 2020 The Kai Tai Sports Park at Kai Tak, Kowloon City District, Hong Kong Design, Supply and Installation of Curtain Wall System for Main Stadium Hip Hing Engineering Co., Ltd. 299,000,000.00 Jun 2023 WIP
J20262 2020 Common Area A&A and Renovation Works at CITIC Tower, 1 Tim Mei Avenue, Central, Hong Kong Replacement and Modification of Existing Curtain Wall System Donago Design & Decoration Limited 2,550,000.00 Completed
J20261 2020 TSWTL33, Area 112, Tin Shui Wai, N.T Glass Wall, Alum. Canopy and Alum. Cladding at Podium and T6 Sky Club Sanfield (Management) Ltd. 70,195,977.32 Aug 2021 Completed
J20260 2020 Commercial Development at KTIL 240, 98 How Ming Street, Kwun Tong, Kowloon, Hong Kong Podium Façade Installation Sanfield (Management) Ltd. 244,788,746.42 Mar 2022 WIP
J20259 2020 Tuen Mun V City 447 Glass Wall Replacement A& A Works Sanfield (Management) Ltd. 8,400,000.00 Completed
J19258 2019 FB1 for YLTL510, Yuen Long, N.T Glass Wall, Aluminium Cladding and Aluminium Partition Sanfield (Management) Ltd. 15,895,110.00 Nov 2021 WIP
J19257 2019 Two Taikoo Place (2B) Development at Taikoo Place, Quarry Bay, Hong Kong Podium Glass Wall Swire Properties Limited 303,100,567.00 Mar 2022 WIP
J19256 2019 NKIL 6550, Off Hing Wah Street, Cheung Sha Wan, Kowloon Curtain Wall, Glass Balustrade and Aluminium Works to Façade Visual Mock Up Sanfield (Management) Ltd. 1,141,500.00 Completed
J19255 2019 Members Stand III 1/F and 5/F at Happy Valley Racecourse of The Hong Kong Jockey Club Glazing Works for M3 1/F & 5/F Hong Kong Jockey Club 3,970,807.40 Completed
J19253 2019 TSWTL34. Wetland Park, Tin Shui Wai, N.T. Glass Wall, Canopy, Skylight & Cladding to Tower, Villa, House, Retail Development Entrance, Clubhouse and Sunset Garden Sanfield (Management) Ltd. 44,670,384.01 Completed
J19252 2019 STTL248, Siu Lek Yuen, Shatin, N.T Additional Steel Platform & Glass Balustrade for Lobby Staircase Sanfield (Management) Ltd. 4,555,160.00 Completed
J19251 2018 Tin Shui Wai Town Lot 34, Area 115, Yuen Long, N.T Glass Wall, Door, Skylight & Cladding to Skylift, Skybridge and Skyclub Sanfield (Management) Ltd. 13,968,777.30 Completed
J19250 2018 Proposed Hotel Development at 239 – 243 Jaffe Road, Hong Kong Façade Installation Paul Y Engineering Company Limited 69,500,000.00 Aug 2021 Completed
J19249 2018 Proposed Hotel and Office Extension, H.H.M.L.6 & Ext (The Harbourfront OT-2) Permanent Glass Panels at Existing Floors Hutchison Whampoa Properties (Management & Agency) Limited 67,137,078.00 Completed
J18248 2018 KCTL522, Kwai On Road, Kwai Chung Curtain Wall, Glass Wall, Aluminium Cladding, Louvre, Grille, Glass Cladding, Glass balustrade and LED Lighting Sanfield (Management) Ltd. 55,450,833.20 Completed
J18247 2018 625 King’s Road Supply Glazing Panels and Repair Curtain Wall Swire Properties
Limited
4,107,140.00 Completed
J18246 2018 Tin Shui Wai Town Lot 34, Area 115, Area 115, Yuen Long, N.T Glass Wall, Canopy and Alum. Cladding to Tower, House and Villa Sanfield (Management) Ltd. 15,625,000.00 Completed
J18245 2018 Harbourfront and Harbour GrandKowloon H.H. M. L. 6 & Ext. Temporary Glass Panels at Existing Floors Hutchison Whampoa Properties (Management & Agency) Limited 15,048,516.00 Completed
J18243 2018 TPTL225, Pak Shek Kok, Tai Po, N.T Glass Wall, Window, Glass Balustrade, Skylight and Aluminium Works to Podium Sanfield (Management) Ltd. 39,311,390.00 Completed
J17241 2017 TKOTL70, Area 86, Site O, Tseung Kwan O, N.T Skylight System, External Aluminium Cladding to Ceiling and Cover Walkway Sanfield (Management) Ltd. 6,030,235.89 Completed
J17240 2017 TKOTL70, Area 86, Lohas Park Package 4 Site O, Tseung Kwan O, N.T. Glass Wall, Aluminium Cladding, Glass Canopy & Skylight to Podium Sanfield (Management) Ltd. 28,422,055.00 Completed
J17239 2017 IL 9027 Phase II, Java Road, North Point, HK Glass Wall, Glass Canopy and Aluminium Cladding to Podium and Retail Sanfield (Management) Ltd. 63,825,017.07 Completed
J17238 2017 STTL 248, Siu Lek Yuen, Shatin, N.T Glass Wall, Window Wall, Shop Front, Alum. Cladding, Grille, Metal / Glass Canopy to Podium Sanfield (Management) Ltd. 25,520,985.00 Completed
J17237 2017 Church Lane, Shau Kei Wan, Hong Kong Curtain Wall and Aluminum Works for Podium, Entrance Lobby and Clubhouse Sanfield (Management) Ltd. 43,184,807.00 Completed
J17236 2017 HVRC 2017 – Grandstand 1F BH & MS III 3F at Happy Valley Racecourse Renovation Works at M3 – 3/F & M2-4/F to 6/F IBI Hong Kong Limited 3,421,891.00 Completed
J17235 2017 STRC 2017 – GS1 1F Member Betting Hall in Shatin Racecourse Glass and Metal Works Design Unlimited Company Limited 4,153,390.00 Completed
J17233 2017 Happy Valley Clubhouse Extension at 25 Shan Kwong Road, Happy Valley, HK Curtain Wall Hip Hing Construction Co., Ltd. 104,000,000.00 Completed
J17232 2017 Sai Lau Kok Garden Conical Feature Works Junic Construction Co., Ltd. 1,271,380.00 Completed
J16231 2016 Taikoo Place Phase 2B Development at Taikoo Place, Island East, Hong Kong Demolition and Associated A&A Works Swire Properties Limited 7,642,613.60 Completed
J16230 2016 NKIL6333 Nam Cheong Station, Kowloon Covered Walkway at 5/F Podium Sanfield (Management) Ltd. 11,304,147.44 Completed
J16229 2016 Hermes Hong Kong Elements Internal Façade Hermes Hong Kong 1,207,084.60 Completed
J16228 2016 Happy Valley Racecourse Glass Wall, Balustrade and Alum. Cladding Hong Kong Jockey Club 2,865,710.00 Completed
J16227 2016 NKIL 6333, Nam Cheong Station, Kowloon Design, Supply & Installation of Glass Wall at 5/F Lift Lobby Tower 1-5 and Block L1-L6 Sanfield (Management) Ltd. 10,534,760.00 Completed
J16226 2016 YLTL 507 CDA15, Yuen Long, N.T Design, Supply & Installation of Aluminium Cladding to Shuttle Lift Lobby Sanfield (Management) Ltd. 1,700,000.00 Completed
J16225 2016 Taikoo Place Phase 2A Development Design, Supply & Installation of Podium Glass Wall Swire Properties Limited 198,973,020.00 Completed
J16223 2016 NKIL 6333, Nam Cheong Station, Kowloon Design, Supply & Installation of Glass Wall, Skylight, Canopy, Cladding & Footbridge Sanfield (Management) Ltd. 107,118,812.38 Completed
J15222 2015 Tseuk Luk Street, San Po Kong, Kowloon Design, Supply & Installation of Glass Wall, Glass Screen, Glass Balustrade, Glass Cladding, Alum. Cladding & Lighting System to Podium Sanfield (Management) Ltd. 19,251,457.05 Completed
J15221 2015 No. 133, Wai Yip Street, Kwun Tong Supply and Installation of Glazing Works for Show Office Design Unlimited Company Limited 2,096,940.00 Completed
J15220 2015 Ocean Terminal Extension and Alteration and Additional Works to Existing Ocean Terminal, Tsim Sha Tsui, Kowloon External Façade Works Harbour City Estates Limited 78,708,125.00 Completed
J15219 2015 Sun Yuen Long Centre, Yuen Long, N.T Dismantling, Supply & Installation of Glass Panel to Existing Window Wall Sanfield (Management) Ltd. 857,300.00 Completed
J15218 2015 Lot 1927, DD107, Sha Po North, Phase 1B, Kam Tin Design, Supply & Installation of Glass Wall and Door, Canopy and Aluminium Works to Clubhouse Sanfield (Management) Ltd. 28,191,379.20 Completed
J15217 2015 No. 680 Castle Peak Road, Kowloon Design, Supply & Installation of Curtain Wall, Aluminium Louvres, Windows, Cladding and Glass Balustrade to Podium and Tower Sanfield (Management) Ltd. 28,941,013.00 Completed
J15216 2015 HVRC Infield Car Park at Happy Valley Racecourse 2015 Design, Supply and Installation of Cladding Wall Hong Kong Jockey Club 759,691.00 Completed
J15215 2015 Pak Hop Restaurant & Bauhinia Restaurant at 4/F Grand stand 1 Shatin Racecourse 2015 Façade Works and Glass Balustrade of RenovationWorks Hong Kong Jockey Club 550,187.00 Completed
J15213 2015 YLTL507, CDA15, Yoho TownPhase 3, Yuen Long, N.T Supply & Installation of Glass Wall, Glass Featureand Aluminium Fins at 5/F Lobby Sanfield (Management) Limited 16,602,844.50 Completed
J15212 2015 Lot 36, Tung Chung Town, N.T Design, Supply & Installation of Curtain Wall, Glass Wall and Aluminium Works to Podium Sanfield (Management) Limited 47,340,750.00 Completed
J14211 2014 TKO66A, Lot 113, Tseung Kwan O, N.T Supply & Installation of Curtain Wall & Aluminium Works at FB2 Chun Fai Construction Company Limited 18,422,522.70 Completed
J14210 2014 TKO66A, Lot 113, Tseung Kwan O, N.T Supply & Installation of Curtain Wall & Aluminium Cladding at Podium Chun Fai Construction Company Limited 33,117,438.00 Completed
J14209 2014 TKO66C1, Lot 114, Tseung Kwan O, N.T Supply & Installation of Glass Wall & Aluminium Cladding at Podium Sanfield (Management) Ltd. 8,591,018.60 Completed
J14208 2014 Proposed Hotel Development at 8A – 8B Wing Hing Street, North Point, HK Supply & Installation of Curtain Wall and Cladding System Sure Luck Development Limited 10,800,000.00 Completed
J14207 2014 YLTL507, CDA15, Yoho Town Phase 3, Yuen Long Supply & Installation of Curtain Wall, Glass Wall, Skylight & Aluminium Cladding for Footbridge Sanfield (Management) Ltd. 58,455,000.00 Completed
J14206 2014 Sun Yuen Long Centre A&A, Yuen Long, N.T Supply & Installation of Curtain Wall, Glass Wall, Aluminium Cladding & Louvre Sanfield (Management) Ltd. 55,463,287.25 Completed
J14205 2014 Sha Po North, Kam Tin, N.T Supply & Installation of Glass Wall, Glass Doors, Skylight, Aluminium Cladding and Featue to Podium Chun Fai Construction Company Limited 46,300,000.00 Completed
J13203 2013 Grand Century Place, Mongkok, Kowloon, HK Supply & Installation of Curtain Wall at L2 – L12 Sanfield (Management) Ltd. 11,529,895.76 Completed
J13202 2013 22 Chun Cheong Street, Tseung Kwan O Industrial Estate Tseung Kwan O – T.K.O.T.L. 39s D ss. 3 & Extension Thereto Design, Supply, Delivery and Installation of Glass Curtain Wall System Towngas Telecommunication Fixed Network Limited 9,980,000.00 Completed
J13201 2013 CHANEL, Canton Road, TST, HK Design, Supply and Installation of Shopfront and Granite Sub-Frames Design Unlimited Co., Ltd. 2,290,140.00 Completed
J13200 2013 YLTL507, CDA15, Yoho Town Phase 3, Yuen Long Supply & Installation of Curtain Wall, Glass Wall, Aluminium Cladding & Louvres for Podium Sanfield (Management) Ltd. 94,076,437.30 Completed
J13199 2013 G/F – 2/F, 15-21 Fa Yuen Street, Mongkok, Kowloon Design & Supply of New Façade and Signboards Nike Hong Kong Limited 3,000,000.00 Completed
J13198 2013 Grand Century Place, Mongkok, Kowloon Supply & Installation of External Louvre, Window and Aluminium Cladding at L3 – L4 (A&A Works) Sanfield(Management) Ltd. 1,359,570.00 Completed
J13197 2013 One & Two Pacific Place Design, Supply and Installation of Glass Wall System Pat Davie Ltd. 15,284,720.00 Completed
J13196(7) 2013 TKO66B, Tseung Kwan O, N,T Design, Supply & Installation of Glass Wall, Aluminium Louvre and Cladding to FB7 Sanfield (Management) Ltd. 13,900,991.00 Completed
J13196 2013 TKO66B, Tseung Kwan O, N,T Design, Supply & Installation of Glass Wall System to Podium Sanfield (Management) Ltd. 29,327,788.00 Completed
J13195 2013 DD109, Lot 2099, Ha Ko Po Tsuen, N.T Supply and Installation of Additional Aluminium & Glass Cladding Chun Fai Construction Company Limited 15,936,120.00 Completed
J12194 2012 De Ricou Serviced Apartment at 109 Repulse Bay Road, Hong Kong Design, Supply and Installation of Glass Wall, Windows, Doors and Louvres at Tower 2,3 & 4 and Changing Room Corridor HSH Management Services Ltd. 2,013,430.00 Completed
J12193 2012 FSSTL202, Fanling, N.TContract No. P120419 Supply & Installation of Curtain Wall, Glass Wall, Aluminium Grille, Louvre & Cladding for Podium Sanfield (Management) Ltd 12,395,955.90 Completed
J12192 2012 Ocean Gallery and Ocean Centre, Tsim Sha Tsui, Kowloon (Phase 2) Glazing and Cladding Works Hsin Chong Construction(Engineering)Ltd. 30,085,740.00 Completed
J11191 2011 “De Ricou Serviced Apartment at 109 Repulse Bay Road, Hong Kong” Aluminium Windows, Doors and Louvre HSH Management Services Ltd. 21,500,000.00 Completed
J11190 2011 “DD109, Lot 2099, Ha Ko Po Tsuen, N.T” Supply & Installation of Glass Wall & Skylight to Podium Façade and Club House Chun Fai Construction Company Limited 29,793,380.00 Completed
J11189 2011 Marco Polo Hong Kong Hotel, Harbour City, Canton Road, Kowloon, HK Visual Mock Up Harbour City Estate Limited 548,170.00 Completed
J11188 2011 Infinitus Plaza, 199 Des Voeux Road, Central, Hong Kong Podium Façade Mock Up LKK Health Products Group Ltd. 1,020,000.00 Completed
J11187 2011 Proposed A & A Works atB/F – 5/F, Gateway HotelBlock C & G/F Gateway IIHarbour City, Canton Road,Tsimshatsui, Kowloon Design, Supply and Installation of Glass Box at Entrance of 1/F Hotel Lobby and 3/F Restaurant Harbour City Management Limited 5,849,530.00 Completed
J11186(6) 2011 Footbridge (FB6) for TMTL 447, Tuen Mun,N.T. Supply & Installation of Glass and Aluminium Cladding Enclosure, Internal Ceiling, Grilles & Glass Balustrade for Footbridge (FB6) Sanfield (Management) Ltd. 19,780,381.00 Completed
J11186(4) 2011 Footbridge 4 for TMTL 447,Tuen Mun, N.T Supply & Installation Glass Wall, Skylight & Cladding for Footbridge (FB4) Sanfield (Management) Ltd. 10,412,048.00 Completed
J11186(P) 2011 T1 to 8 Tower Entrance and Podium Club House TMTL Mun, N.T. Supply and Installation of Podium Façade (Phase 1) Sanfield (Management) Limited 91,971,000.00 Completed
J11185 2011 Nike Retail at Nelson Street / Fa Yuen Street, Kowloon Design & Supply of New Façade and Signboards Nike Hong Kong Limited 1,300,000.00 Completed
J11183 2011 Term Contract for Glass Wall at Happy Valley Racecourse and Sha Tin Racecourse of the Hong Kong Jockey Club 2011-2014 Design, Supply and Installation of Glass Wall, Glass Balustrade and Metal Cladding The Hong Kong Jockey Club 132,000,000.00 Completed
J10182 2010 Proposed Residential Development at TPTL No. 186, Pak Shek Kok Development Area, Phase I, Site B, Tai Po, NT Design, Supply and Installation of Curtain Wall and Glass Wall China Overseas Building – Bordon Joint Venture 37,545,448.00 Completed
J10181 2010 Revitalization of CITIC Tower at 1 Tim Mei Avenue, Central, HK Modification of Curtain Wall and New Curtain Wall / Glass Wall Installation Martin Construction Co., Ltd. 4,390,000.00 Completed
J10180 2010 KIL11195, Larch Street & Fir Street, Tai Kok Tsui, Kowloon Design, Supply and Installation of Acrylic Panel for Swimming Pool Sanfield (Management) Limited 1,110,200.00 Completed
J10179 2010 Provision of a Permanent Planning & Infrastructure Exhibition Gallery at City Hall Annex, Edinburgh Place (Contract No. AL T315) Design, Supply and Installation of Moisture Barrier W. Hing Construction Co., Ltd. 2,900,000.00 Completed
J10177 2010 Footbridge Lift Shaft for Western Harbour Crossing Scheme 4 Traffic Improvement Works Design, Supply & Installation of Glass Enclosure Harbour Vantage Management Ltd. 2,790,000.00 Completed
J10176 2010 Nos. 24-32 Ming Yuen Western Street, North Point, Hong Kong Design, Supply and Installation of Podium Façade Bond Star Development Limited 9,144,920.00 Completed
J10175 2010 Mass Gaming Hall for Building C at Galaxy Resort & Casino at Cotai City, Macau Design, Supply and Installation of Stained Glass Dome Ceiling Galaxy Entertainment Group 16,300,000.00 Completed
J10173 2010 Pacific Place Mall Contemporisation Pacific Place, 88 Queensway, HK Mall Interior Improvement Works Mall Spine Bubble Lifts Design, Supply and Installation of Bubble Lift Glass Enclosure and Profile Aluminium Cladding at Mall Spine Swire Properties Limited 7,051,950.00 Completed
J10172 2010 Shatin Racecourse for The Hong Kong Jockey Club Design, Supply and Installation of Glass Wall, Glass Balustrade and Aluminium Cladding The Hong Kong Jockey Club 2,809,060.00 Completed
J10171 2010 Po Yip Street, Yuen Long N.T Supply & Installation of Glass Wall, Canopy & Skylight at Podium & Simplex Floor Sanfield Engineering Construction Ltd. 11,352,000.00 Completed
J10170 2010 CDA12, Yoho Town P2, Yuen Long, N.T Supply and Installation of Glass Wall, Alum Features to Podium Façade Sanfield Engineering Construction Ltd. 8,924,978.00 Completed
J10169 2010 Development at NKIL 6308, San Po Kong, Kowloon, Hong Kong Design, Supply & Installation of Curtain Wall, Window Wall & Glass Wall Yee Fai Construction Co., Ltd. 1,728,903.00 Completed
J10168 2010 Permanent Planning Infrastructure Exhibition Gallery at City Hall Annex, Central Design & Build Curtain Wall, Folding Door System, Skylight and Glass Balustrade W. Hing Construction Company Limited 6,841,070.00 Completed
J10166 2010 K-Point Shopping Centre, Tuen Mun, N.T (屯門錦華廣場) Supply and Installation of Aluminium Cladding & Spider Glass Wall Sanfield Engineering Construction Ltd. 2,704,336.00 Completed
J09165 2009 West Island Line Re-Provisioning of HK Central Dental Laboratory Design, Supply & Installation of Curtain Wall, Canopy, Staircase Glass Enclosure & Glass Balustrade to the New Wing Building Sun Fook Kong Construction Limited 12,162,590.00 Completed
J09163 2009 CDA12, Yoho Town P2, Yuen Long, N.T (新時代廣場2期) Supply & Installation of Aluminium Feature Wall Façade to Podium Sanfield (Management) Limited 13,128,204.00 Completed
J09162 2009 YLTL 504, CDA 12, Yoho Town, Phase II Yuen Long (新時代廣場2期) Design, Supply & Installation of Glass Wall, Curtain Wall & Cladding Works Sanfield (Management) Limited 55,369,958.00 Completed
J08161 2008 6/F, 7/F & 8/F of Grandstand 1 in Shatin Racecourse (沙田馬場) Design, Supply and Installation of Glass Wall, Glass Balustrade and Aluminium Cladding The Hong Kong Jockey Club 33,605,529.00 Completed
J08160 2008 TMTL 447 KCRC Station Entrance and Footbridge Design, Supply & Installation of Aluminium and metal works Sanfield (Management) Limited 12,516,465.00 Completed
J08159 2008 Pacific Place Mall Contemporisation Pacific Place, 88 Queensway, HK Mall interior improvement works package Avenue of light “AOL” Supply & Installation of Half Hour FRP Walkable Glass Floor Swire Properties Limited 47,569,823.00 Completed
J08158 2008 “Domani” Italian Restaurant, Pacific Place Mall Contemorization Supply and Installation of Glass Canopy Swire Properties Limited 4,627,286.00 Completed
J08157 2008 Hong Kong Jockey Club Members Stand 1 Building at Happy Valley Glass Wall Extension at Balconies of HVRC M1 6/F & 7/F and Glass Canopy Extension at HVRC M1 5/F Nominated Subcontract for Extension of 6/F & 7/F Owner Box at members stand 1 building at Happy Valley Racecourse Hong Kong Jockey Club 6,417,528.00 Completed
J08156 2008 World Trade Centre at 280 Gloucester Road, Causeway Bay New Façade for Podium Sanfield (Management) Limited 15,819,755.00 Completed
J07155 2007 Administration Building of Aberdeen Tunnel, Wong Chuk Hang, HK Repair Works to Curtain Wall System Architectural Service Department 1,530,000.00 Completed
J07154 2007 Atrium Hotel at Pacific Place, 88 Queensway, Hong Kong Supply & Installation of Operable Windows to Existing Curtain Wlal Hsin Chong Construction (Asia) Limited 3,187,350.00 Completed
J07153 2007 Nike Shop, Canton Road, Hong Kong Supply & Installation of Curtain Wall, External Signage System and Internal Shopfront Nike Hong Kong Limited 3,195,078.00 Completed
J07152 2007 “Domani” Italian Restaurant, Pacific Place Mall Contemorization Design, Supply and Install Antique Brass Cladding, Glass Enclosure and Glass Canopy Swire Properties Limited 5,249,971.00 Completed
J07151 2007 Peak One, Shatin (一號雲頂) Design, Supply and Install Lobbies & Club House Glass Wall, Skylights and Metal Canopies Sanfield (Management) Limited 15,000,000.00 Completed
J07150 2007 Venetian Orient – Parcel 5 & 6 Macau Design, Supply & Install of Skylights and Support Steelwork Venetian Orient Limited MOP66500830 Suspended
J07149 2007 Luk Yeung Galleria, Tsuen Wan Construction of Curtain Wall MTR Corporation Limited 9,400,572.00 Completed
J07148 2007 San Po Kong – Mock Up P07066 Aluminium Works Sun Hung Kai Properties Limited 1,576,730.00 Completed
J07147 2007 Rocky Bank Replacement of Glass Balustrade and Window Pane at House 1 to House 6 Swire Properties Limited 2,410,625.00 Completed
J07146 2007 Flonent Rise Tower, Cherry Street, West Kowloon (海桃灣) Design, Supply and Installation of Curtain Wall, Glass Wall, Glass & Metal Feature, Window & Louvers for Podium Works Chun Yip Construction Co., Ltd. 28,030,000.00 Completed
J07145 2007 Coastal Skyline Phase 4 Le Bleu Deux (藍天海岸4期水藍天岸) Design, Supply and Install Lobbies Glass Wall, Covered Walkway and Glass Balustrade Tung Chung Station Development Company Ltd. 10,624,730.00 Completed
J07143 2007 Existing Buildings and New Footbridges for the Target Cost Contract for Taikoo Place Linkage Design, Supply and Install Natural Anodized Aluminium Footbridge / Wall Claddings, Rigidal Aluminium Roof, Glass Wall, Skylight and Glass Balustrade Swire Properties Management Ltd. 15,270,233.00 Completed
J07142 2006 Alterations and Additions Works at B/F to 3/F(Cinema Portion) Silvercord, 30 Canton Road, Tsim Sha Tsui, Hong Kong Design, Supply & Installation of Curtain Walls, Glass Walls, Metal Cladding, Louvres & Associated Works Silvercord Limited 5,498,106.00 Completed
J06141 2006 Conversion of Existing Facilities at M2 7/F & 8/F and M3 9/F in Happy Valley Racecourse and D710 & D711 at Shatin Racecourse for The Racecourse Club Design, Supply and Installation of Glass Wall and Glass Balustrade Hong Kong Jockey Club 1,157,350.00 Completed
J06138 2006 Tai Po Mega Mall Supply and Installation of Billboard Sun Hung Kai Properties Limited 1,660,893.00 Completed
J06136 2006 Silvercord, 30 Canton Road, Tsim Sha Tsui Kowloon, Phase II Design and Supply of Curtain Wall Alterations & Additions Works Silvercord Limited 2,920,150.00 Completed
J06135 2006 ICAC Headquarters Building at Java Road, North Point, Hong Kong, ASD Contract No. SS M319 Design, Supply and Install Podium Curtain Wall, Aluminium Claddings and Glass Canopy Shui On Construction Company Limited 7,837,552.00 Completed